Once we have established the probable presence of natural gas or oil deposits in a specific location through testing carried out by our geologists and geophysicists, we deploy a team of expert drillers to dig down into the deposit where we estimate it to be.
Although this process is carried out on the probability of finding resources based on advanced testing and data interpretation, we only drill if we have high degree of certainty there are deposits in the location.
The precise and accurate placement of the drill that will dig into the ground depends on the characteristics of the subsurface consistency and the depth required to enter the probable deposit. After our team of geophysicists has identified a prime location for the drill on the surface, we then seek legal and regulatory permission to begin operations, obtaining permits and authorization.
If we indeed do find natural gas or oil deposits once we have begun operations, the initial well created by the drilling team will be developed to allow for the efficient and safe extraction of the resources. We will establish production facilities and it will become a productive and legal asset or Refined Shale Gas.